DETAILED QUOTE REQUEST

Tell Us About Your Custom Sign

One sign or a larger order, for your business or personal space. Share your idea, text, logo, sketch or reference image, and tell us what you would like to create.

20+Years in Sign Manufacturing

500+Custom Sign Projects

30+Countries Supplied

2,000 m²Manufacturing Facility

BEFORE YOU START

Start with what you have.

You do not need a finished design or confirmed specifications to contact us. Start with what you know, and we’ll review the details needed for your custom quote.

01

Your idea & quantity

  • Text, a logo, a sketch, a reference image or a description
  • Sign type, preferred size and quantity, if known

02

Where you will use it

  • Indoor or outdoor environment
  • Wall or mounting details and photos, if available

03

Delivery & other details

  • Delivery country and power requirements, if known
  • Any date you are working towards

CUSTOM SIGN SUPPORT

Contact location

Building 1, Taihe Plaza, Baodao Middle Road, Shishi, Fujian, China

DETAILED QUOTE REQUEST

Your Detailed Quote Request

Businesses and individuals are welcome. Orders start from 1 piece. Complete the details you know; product, size, material and installation information can be discussed if you are unsure.


Uploaded files are used only for quotation and engineering review.

WHAT HAPPENS NEXT

From your idea to an agreed design.

01

Review your idea

We review what you would like to create, the quantity and any references you share.

02

Work through the details

We discuss size, materials, lighting and how the sign will be used, including any details still to be confirmed.

03

Confirm your custom quote

Your quote sets out the proposed sign, what is included and the requirements for your order.

04

Approve before production

Fabrication starts only after the production reference and commercial terms are confirmed.

BEFORE YOU SEND

Before you send.

You can start with an idea. Share what you know about your sign, even if you do not have drawings, exact dimensions or a material choice yet.

Prefer email? Tell us your idea →

Do I need a finished design before contacting you?

You can start with text, a logo, a sketch, a reference image, or a description of your idea. We’ll review the details needed for your custom quote.

Which files can I send?

Upload one PDF, JPG or PNG file up to 20 MB. A multi-page PDF can include artwork, dimensions and site photos. If you have editable vector files or a larger file set, mention this in your project notes so a suitable transfer method can be agreed.

What installation information is most useful?

Include the mounting surface, available depth, power access, cable route, destination voltage, site photos and any landlord or local approval constraints.

How are uploaded files used during project review?

Artwork, drawings and site photos are reviewed together with the project notes to identify missing dimensions, construction, mounting, voltage or delivery inputs before quotation.