CUSTOM LIGHT BOXES
Custom LED Light Box Signs
Display your logo, artwork or message on an illuminated face. Choose a light box for a storefront, wall or display area, starting from 1 light box. Share your image or idea, then explore the size, shape, face material and mounting options.
- Fabric, acrylic and metal cabinet formats
- Single-sided, double-sided and projecting options
- Graphics access and maintenance planned before fabrication

PRODUCT EXAMPLES
Explore LED Light Box Builds
Compare cabinet shapes, graphic faces and viewing arrangements. Select an example to inspect the real product more closely.












Use these examples to describe your preferred appearance. Cabinet construction, face material and mounting are reviewed for your project.
COMPARE THE FORMATS
Choose the Light Box Format
Start with the graphic and viewing arrangement, then review the face system and cabinet build. A similar appearance can use different internal construction.

Fabric / SEG Light Box
A replaceable fabric graphic creates a broad illuminated display area.
Confirm frame size, graphic access and the installation conditions.

Acrylic / Rigid Face Cabinet
A rigid illuminated face carries lettering, logos or graphics.
Confirm cabinet depth, face construction and service access.

Double-Sided Projecting
A cabinet extends from the wall or support for viewing from two directions.
Confirm bracket arrangement, sightlines and the cable route.

Slim / Edge-Lit Display
A slim display profile can suit interior graphic applications.
Confirm display size, graphic type and the proposed lighting and service method.
WHAT YOU CAN DEFINE
Customize the Cabinet & Face
Cabinet Shape & Size
Rectangular, round, oval or project-specific shapes, reviewed with the artwork and available space.
Face / Graphic Type
Rigid face, fabric graphic or another confirmed display construction. Compare flexible and rigid faces →
Single or Double Sided
Defined by where people should see the graphic and how the sign is positioned.
Cabinet Depth & Finish
Depth, visible frame and finish are reviewed with the selected cabinet build.
Lighting
LED layout and illumination are reviewed around cabinet depth, face and the desired effect. Review illumination planning →
Mounting
Wall-mounted, projecting, suspended or another confirmed arrangement, coordinated with the site.
PLAN THE SITE INTERFACE
Installation, Graphic Change & Service Access
Installation is only one part of the review. Plan how the graphic, lighting and power components can be reached after the sign is in place.
Viewing Direction
Mark the directions from which people should see the graphic. This helps define the number of faces and their orientation.
Mounting & Structure
Share the wall, bracket or suspension location and the supporting structure. Fixing positions and the supplied mounting scope are reviewed together.
Graphic Replacement
Tell us whether the graphic will remain fixed or change. The cabinet design determines how the face or graphic is reached and removed. Plan graphic replacement →
LED / Driver Access
Agree where lighting components can be reached before fabrication, including access clearance and removable parts.
Cable & Power Entry
Coordinate the cable route, power entry and driver location with the installation site. Review power planning →
Indoor / Outdoor Exposure
Identify the actual environment. Cabinet construction, sealing and access details are reviewed for that location.


MANUFACTURING REFERENCES
From Cabinet Fabrication to Lighting Test
The approved cabinet, face, lighting and access details guide fabrication and assembly.
01
Cabinet Fabrication

Cut and form components for the agreed cabinet construction.
02
Component Preparation

Prepare and group cabinet components for assembly.
03
Finished Illumination Check

Review the visible lighting effect with the face in place before packing.
04
Packing & Handover

Packing and supplied items are prepared around the agreed project scope and destination.
Packing references, component labels and installation information are agreed with the supplied scope. Read the manufacturing guide →
START YOUR REVIEW
What We Need to Confirm
Start with what you already have. We will identify the remaining project details during review.
| Project item | What to share |
|---|---|
| Artwork / Graphic | Artwork file or a usable reference for the message, logo or display graphic. |
| Overall Size | Approximate dimensions or the available installation space. |
| Light Box Type | Preferred format or a product example you like, if known. |
| Single / Double Sided | Viewing directions and the number of visible faces. |
| Face / Graphic Type | Preferred face material and whether graphics need to change. |
| Cabinet / Finish | Cabinet shape, visible depth or finish references, where available. |
| Mounting | Site photograph, wall or support details and the proposed mounting position. |
| Power / Service Access | Known power location, cable route and space for future access. |
| Quantity | Required quantity and any planned repeat orders. |
| Project Location | Installation location and indoor or outdoor conditions. |
| Delivery | Destination and the items or documentation expected within the supply scope. |
BUYER QUESTIONS
Questions About LED Light Box Signs
Can I start without final cabinet dimensions?
Yes. Share an approximate size, the available space or a site photograph. We can begin the review with that information and identify the dimensions that need to be agreed before production.
Can the graphic or face be replaced later?
That depends on the selected face and cabinet construction. Tell us about expected graphic changes early so the opening method, face retention and access clearance can be reviewed.
Can you build single-sided and double-sided light boxes?
Both formats are part of the product range. The viewing directions, mounting position and artwork help determine which arrangement suits your project.
What information is needed for a projecting light box?
Send the artwork, approximate cabinet size, viewing directions and a photograph or drawing of the mounting location. Include known wall or support details, available projection and cable route.
How is service access reviewed before production?
We review how the face, LEDs and driver can be reached in the proposed installation. Access direction, removable parts, clearance and cable routing need to be agreed with the cabinet construction.
What should I send for a quotation?
Start with artwork or a reference, approximate size, quantity and destination. Add the preferred light box format, viewing direction and installation context if available. We will identify the remaining details during review.
SELECTED TECHNICAL GUIDES
Plan the Next Detail
Still comparing overall sign formats? Compare channel letters and light boxes →
START YOUR LIGHT BOX PROJECT
Create a Light Box for Your Message
Start with the graphic, logo or message you want to display, even if the artwork is not finished. Tell us where the light box will be used and any size preference. Orders start from 1 light box.