
Wholesale LED Sign Manufacturer | Factory Direct | OEM/ODM
Custom LED Channel Letters & Signs
Built to Your Drawing, Delivered Globally
Backlit letters, mini letters, flat channel letters, super 3D letters, neon signs, mirror infinity signs & custom storefront signs.
One-stop service from design & prototyping to production & after-sales support.
1 piece minimum — no drawing needed, we can redraw your sketch or photo.
Product Range
Custom Signs We Manufacture

Front Lit Channel Letters
Bright illuminated face for storefront visibility.
View Details →
Mini Channel Letters
Small premium letters for reception walls.
View Details →
Reverse Halo Lit Letters
Backlit glow for offices & hotels.
View Details →
LED Neon Signs
Flexible neon, 50,000+ hour lifespan.
View Details →
Marquee Bulb Letters
Vintage bulb letters for events & hospitality.
View Details →
LED Light Box Signs
Aluminum cabinet signs for storefronts.
View Details →
Non-Illuminated Letters
Stainless steel & acrylic dimensional signs.
View Details →
Infinity Mirror Signs
3D depth mirror signs for brand walls.
View Details →Why Choose Us
Why Buy Direct From Our Factory

Drawing-Controlled Production
Every sign built to approved drawings — no guesswork.

In-House Full Process
Laser cutting, welding, painting, assembly all under one roof.

One-Stop OEM/ODM Service
From artwork review to after-sales support — end to end.

Wholesale for Global Clients
Serving sign shops and brands in 30+ countries worldwide.
Common Problems We Solve
Tired Of Signs That Don't Last?
Uneven Glow & Hot Spots
Cheap signs have bright spots and dark areas. We use high-quality LED modules with proper spacing for even, uniform illumination.
Fading & Discoloration
Cheap paint fades in 1-2 years. We use powder coating rated for 5+ years outdoor use, with proper UV protection.
Water Damage & Shorts
Poor waterproofing leads to failures. We use IP65 rated seals, waterproof connectors and proper drainage design.
Complicated Installation
Hard-to-install signs cost extra labor. We provide detailed mounting templates and support for your installer.
Workflow
One-Stop Workflow From Artwork to Delivery
01
Artwork Review
Send artwork, dimensions & quantity.
02
Engineering Confirmation
Approve drawings, mounting & wiring.
03
Prototyping & Production
Build sample, then full production run.
04
QC Inspection
Check dimensions, finish & illumination.
05
Global Delivery
Export-packed, shipped to your destination.
Production
12-Step Precision Manufacturing
Every sign moves through the same 12 stages in our factory — from laser cutting to export packing. Exact sequence matches our production floor.

Panel Engraving
Base panels engraved to specification.

Laser Cutting
Letter shapes precision-cut from sheet.

Trim Grooving
Grooves for trim caps and clean edges.

Laser Welding
Metal returns and seams joined.

Weld Grinding
Welds ground smooth and invisible.

Paint & Bake
Durable color finish, baked on.

LED Mounting
LED modules positioned on base plates.

Solder & Pre-Test
Circuits soldered and pre-tested.

Assembly
Components assembled and reinforced.

Lighting Test
Full power-on illumination check.

Surface Clean
Signs cleaned and inspected.

Pack & Ship
Protective packing for export.
Portfolio
Recent Projects & Production Examples
Our Work
Real Projects & Installation Process
Actual installed signs from customers in 30+ countries, plus on-site installation process. Not stock photos - real factories, real installations.










Compliance
Certified Components & Export Standards
Core LED modules, power supplies and materials used in our signs are backed by recognized component-level certifications. Export-ready packing for safe global delivery.

ISO 9001:2015

ISO 14001:2015

CE / RoHS

SGS LVD Report
Trusted Worldwide
We Work With Sign Makers & Brands In 30+ Countries






What Our Clients Say










FAQ
Questions Buyers Often Ask
Get Your Free Quote in 24 Hours
Free artwork review · Free cost estimate · Custom solution for your project
AI / EPS / SVG / PDF artwork accepted





