CUSTOM CHANNEL LETTERS
Custom Channel
Letter Signs
Make your name or logo stand out with dimensional illuminated letters. Choose front-lit, halo-lit or combined lighting for a storefront, office or suitable feature wall. Order from 1 complete sign or letter set; your quote will list the letters, logo parts and supplied components.
A name, logo, sketch or description is enough to start. Size and technical details can be confirmed later.

START WITH THE EFFECT
Compare Four Lighting Styles
Choose the appearance first. We can review the build once you share your artwork and installation context.

01 / LIGHTING STYLE
Front-Lit
A bright, illuminated face.
The face provides the visible light; the returns define the letter depth. Review face color, stroke width and the surrounding light.

02 / LIGHTING STYLE
Halo-Lit
Light reflected onto the wall.
Light exits behind the letter. Wall color, texture and stand-off distance influence the halo; confirm these with the installation surface.
03 / LIGHTING STYLE
Dual-Lit
Face illumination plus a rear halo.
Combines the two lighting directions. Review the face and halo effect together, including color, wall finish and clearance.
04 / LIGHTING STYLE
Open-Face
Visible light sources within the letter.
An exposed-light appearance. Confirm the light-source arrangement, enclosure and protection for the site; do not assume a marquee bulb construction.
Photographs are visual references from different signs and samples, not one project record or proof of a direct brand relationship.
Front-lit vs halo-lit: a closer comparisonPRODUCT EXAMPLES
Explore Channel Letter Designs
Explore different letterforms, finishes and lighting combinations. Use these examples as a starting point for your own sign.












Select an image for a closer look. Mention its name when you share your idea. Brand graphics are visual references, not a claim of a direct brand relationship.
Have a Design in Mind? Send Your ArtworkINSIDE THE LETTER
The Details Behind the Effect
Returns, faces and LED layouts work together. These workshop views show different components during assembly—not a complete build record for one sign.

Letter Shell & Return Depth
Aluminum or stainless-steel returns and backs, with acrylic faces where the lighting design requires them. Trim-cap or trimless details are reviewed with the artwork and construction.

LED layout & cable routing
Module spacing, stroke width and letter depth influence the lighting layout. Confirm cable exits and access before the drawing is released for production.

Rear Fixing & Cable Exit
The backing layer and projecting metal fixing rods are visible in this sample. Fixing positions and the cable-exit location are reviewed for the selected letter build and site interface.
Backing details and cable exits vary with the selected construction. The side-profile reference below shows a trailing cable.
FIT THE SITE
Mounting, Power & Project Options
You do not need every answer to start. Share the known site conditions; we will identify what still needs confirming.
What You Can Define
- Letterform & Size
- Shape and proportions are developed from the supplied artwork and project dimensions.
- Face & Return
- Face construction, return depth and edge treatment are reviewed for the required appearance.
- Color & Finish
- Color references and available surface finishes are confirmed before production.
- Lighting Effect
- Front-lit, halo-lit, dual-lit or other confirmed configurations can be reviewed with the artwork.
- Mounting Approach
- Direct studs, raceway, backer panels, rails or stand-off arrangements can be reviewed where applicable.
What We Need to Confirm
You can start with what you already have. We will identify the remaining items during review.
- Artwork & Dimensions
- Logo or lettering files, approximate dimensions and quantity.
- Surface & Mounting Condition
- Installation surface, available fixing area and site photos.
- Cable Route & Power Conditions
- Cable path, site supply, driver location and maintenance access, where known.
- Environment & Project Location
- Indoor or outdoor use, exposure and the installation location.
- Delivery Requirements
- Destination, shipment grouping and any requested handover support.

Installation & Handover Support
Project drawings, mounting references, cable and power coordination, and supplied-item references can support the agreed handover. Project-specific installation information is provided where agreed.
Mounting coordination guideFactory scope and site work are agreed separately. The project’s qualified local professionals confirm wall support, fixings, applicable requirements and final installation.
FROM DRAWING TO DELIVERY
A Letter Set. A Defined Scope.
Agree the build before fabrication, then review the finished set and the items included in the shipment.

01 / FABRICATION
Metal Fabrication
This close view shows a seam being joined on a shaped metal component. Outlines, depth, finish, mounting points and cable exits are agreed in the production reference.

02 / ASSEMBLY
Letter Assembly
Components are organized at the assembly tables. Dimensions, visible finish and illumination are checked against the agreed reference before packing.

03 / PACKING
Packing Preparation
The open crate shows boxed components grouped for packing. Surface protection, component grouping and supplied items are prepared around the agreed project scope and destination.
What Can Be Included in the Handover
- Approved production reference
- Supplied component identification
- Packing or grouping reference
- Project-specific installation information, where agreed
Included documents and components are confirmed in the quotation and approved scope.
BEFORE YOU SEND THE BRIEF
Start With What You Have
A reference, a drawing or a few site photos can start the conversation.
Can I start without a complete drawing?
Yes. Send the artwork or reference image, approximate size, quantity and a site photo if available. We can review what you have and identify the missing decisions before a production drawing is approved.
What if I do not know the wall or power details yet?
Send the site photos and information you have. Mounting, cable routing, driver location and destination supply can then be coordinated with your installer before the build is confirmed.
Can I approve a prototype before repeat production?
Prototype and repeat-production support are available. Agree the prototype scope, cost, finish references and approval drawing first; keep that approved reference for the repeat order.
What should I send for a quotation?
Send your artwork, approximate dimensions, quantity, intended lighting effect, site photos and delivery destination. Share what is available; missing mounting or power details can be identified during review. The quotation defines the supplied scope. What affects channel letter pricing
Can approved drawings be reused for later orders?
An approved drawing can serve as a reference for a repeat order. Confirm its revision, dimensions, finish, lighting and supplied components, and flag any changes to the new site or delivery requirements before production.
YOUR CHANNEL LETTER PROJECT
Show Us the Sign You Have in Mind
Share your text, logo or idea, starting from one sign or set. Add a preferred size, lighting effect or wall photo if you have one; we’ll review the remaining details for your quote.