ABOUT PRIDLED · CUSTOM SIGN MANUFACTURING
Custom Signs, Made for Your Ideas
PridLED creates custom signs for businesses and individuals. Whether you need one sign for your space or signs for a larger project, tell us what you want to create.
For businesses, individuals and professional partners. Orders from 1 piece.

Built for Custom Sign Projects
We make illuminated and non-illuminated signs around your text, logo or design. Choose a suitable sign for a shop, office or personal space, or discuss a larger order. Before production, the agreed design brings together materials, construction and the details needed to make your sign.
20+
Years in sign manufacturing
500+
Custom sign projects
30+
Countries supplied
2,000 m²
Manufacturing facility
FACTORY ENVIRONMENT
Step Inside the Factory
A working environment, from parts to packed signs.
See the people, worktables and production areas behind custom sign orders. The tour includes office and workshop views.
WHAT TO LOOK FOR
Sign components in progress. Assembly workstations. Finished signs prepared for packing.
FABRICATION & ASSEMBLY
Real Work, Visible in the Details
From cut parts to assembled letters, these workshop images show what each production stage involves.

01 / LASER CUTTING
Sheet-metal components
Letter shapes cut from sheet material.

02 / METAL FABRICATION
Letter bodies and returns
Metal returns joined into the sign body.

03 / CNC ROUTING
Panels and sign components
Sheet components processed on the CNC worktable.

04 / LED ASSEMBLY
Modules and wiring
LED layout and cable routes assembled inside the letter.
MANUFACTURING PROCESS
What Happens After Drawing Approval
The approved drawing connects four production stages. Detailed methods depend on the sign construction and project requirements.
01
Process the materials
Cut, route and form metal or acrylic components to the approved drawing.
02
Fabricate & finish
Weld, grind and finish the sign body; review edges, surfaces and structural assembly.
03
Assemble the lighting
Fit LED modules, wiring and drivers around the agreed voltage, cable exits and access.
04
Inspect & pack
Review dimensions, finish, lighting and hardware before preparing the agreed packing scope.
BUYER REVIEW
What Buyers Can Verify Before Shipment
Agree the review points for your project: dimensions, finish, illumination, supplied hardware and packing.

Lighting & finished-sign review
Review electrical function, illumination consistency and visible finish. Confirm any project-specific test or aging requirements before production.

Packing & project handover
Confirm sign components, mounting hardware, labels and protective packing against the agreed shipment scope.
FACTORY PROOF
Six Points to Review With Our Team
01
Drawing review
Construction, dimensions and installation inputs.
02
Fabrication
Sign bodies, components and surface finish.
03
LED assembly
Module layout, wiring and cable exits.
04
Inspection
Visible finish and agreed functional checks.
05
Packing
Protection, hardware and shipment scope.
06
Documentation
Applicable records and project information.
COMPLIANCE & DOCUMENTATION
Selected Supplier & Component Records
Named supplier and component records. Confirm the holder, scope and project applicability; these records do not certify PridLED or every finished sign.



Blueview · Applicability to revalidate
SGS fixed luminaire
Check scope for the proposed component.

Rightleds · Historical supplier record
RoHS record · 2007
Historical reference; low-resolution scan.

Rightleds · Historical supplier record
CE record · 2007
Historical reference; verify current scope.

Rightleds · Historical supplier record
CE declaration · 2013
Historical reference; verify current scope.
START WITH YOUR PROJECT
Send Your Sign Project for Engineering Review
Share your idea, preferred size and quantity, if known. A logo, sketch, reference image or description is enough to start the conversation.