
Custom Marquee Letters
Bulb-lit dimensional letters for events, hospitality and displays. Warm, nostalgic glow that photographs beautifully.

Gallery
Marquee Letters in Detail









What Are Marquee Letters?
Marquee letters are bulb-lit dimensional signs inspired by vintage theater and cinema signage. Each letter is constructed from steel or aluminum and fitted with round E12-style bulb sockets. The warm, nostalgic glow makes them popular for weddings, events, restaurants, bars and retail displays.
Where Marquee Letters Are Used
Weddings and events: "LOVE", "MR & MRS", custom names or dates as photo backdrops.
Hospitality: Bar names, restaurant logos and directional signs with a vintage feel.
Retail and branding: Product launches, window displays and seasonal promotions.

Marquee Options
What We Build

Bulb-Lit Letters
Classic marquee style with screw-in bulbs on painted metal frame.

Custom Shapes
Hearts, stars, arrows or your brand shape in bulb-lit construction.

Large Event Letters
3ft+ tall letters for weddings, galas and festivals.

Indoor / Outdoor
Sealed outdoor frames or lightweight indoor event builds.
Start Your Project
What the Specification Must Fix
Tell us your phrase, size and style. We'll confirm construction and lead time.
Send Your Details- Text, phrase or shape you want
- Height per letter (e.g. 2ft, 3ft, 4ft)
- Bulb color: warm amber, cool white, colored, or mixed
- Frame finish: black, white, gold, or custom color
- Indoor or outdoor use
- Quantity and destination country
Manufacturing Process
Built In-House, Tested Before Shipping

Artwork Review
We review your artwork, dimensions and mounting requirements, then produce a detailed drawing for your approval.

Precision Fabrication
All parts are cut, formed and welded in our own factory - no outsourcing, full quality control at every step.

LED Assembly & Wiring
High-quality LED modules are installed, wired and configured to your brightness and color requirements.

QC Test & Packing
Every sign undergoes 24-hour illumination testing, then is carefully packed in custom export cartons.
Specifications
Standard Specs
| Letter Height | 60cm / 90cm / 120cm (custom sizes available) |
| Bulb Type | E26/E27 incandescent or LED globe bulbs |
| Frame | Powder-coated steel / Aluminum, rust-resistant |
| Finish | White / Black / Gold / Silver / Custom PMS color |
| Power | 110–120V / 220–240V, daisy-chain compatible |
| Use | Indoor and covered outdoor (events, weddings, hospitality) |
| Warranty | 1 year (structural), bulbs replaceable |
| Components | CE / RoHS approved power supply and wiring |
| Lead Time | 10–15 working days |
| Shipping | Sea freight / Air freight / Express (DHL, FedEx) |
| Packing | Foam wrap + export wooden crate |
Not sure which type?
Which Sign Type Is Right For You?
Industry Knowledge
Related Guides & Articles

Marquee Letter Scope and Specification
What affects the cost of custom marquee letters and how to budget for your project.
Read More →
Marquee Letter Installation Guide
Common mounting methods and what to prepare before your marquee sign arrives.
Read More →
Artwork File Preparation
What file formats and design specifications we need to produce your sign.
Read More →FAQ
Marquee Questions
Planning an Event or Installation?
Tell us your phrase and venue. We'll build marquee letters that arrive ready to light up.
Application guides
Where marquee letters are used
Each guide covers the specification logic, the failure modes and the installation conditions for that type of premises.
Channel Letters for Bars & Nightclubs
Halo or face-lit letters, neon accents and DMX scenes for late hours.
Read guide →Channel Letters for Restaurants
Front-lit or halo build, sized from the road, with oil and salt-air material choices.
Read guide →Sign Maintenance Schedule
Monthly walk-round, quarterly checks and an annual clean that keeps a sign looking new.
Read guide →

