INSTALLATION REFERENCE · BLADE CABINET
Double-Sided Illuminated Blade Cabinet Installation Reference
The current photograph shows a compact double-sided illuminated blade cabinet mounted perpendicular to a storefront. It does not verify original cabinet fabrication, testing, packing or installation scope.
- Visible double-sided projecting format
- Wall bracket and installed position visible
- Comparable quotes require bracket, access and exposure inputs

RELATED REVIEW PATH
Review the Product, Building Interface and Packing Controls for This Reference
Use these pages to compare the visible blade-cabinet format with the wall, bracket, electrical and shipment inputs required for a comparable quotation.
INSTALLATION REFERENCE
What This Reference Can Verify
Only observable features and clearly stated evidence limits are included below.
| Reference Type | Installed double-sided blade cabinet |
|---|---|
| Public Identifiers | Client and location not publicly disclosed |
| Evidence Shown | Double-sided illuminated cabinet installed on a storefront façade |
| Visible Details | Projecting orientation, relative proportions, wall bracket and illuminated faces |
| Not Verified | Materials, cabinet depth, LED layout, face access, testing, packing or installation result |
| Similar Quote Needs | Artwork, dimensions, face and cabinet construction, bracket and wall interface, service access, voltage, exposure, quantity and destination |
QUOTE PREPARATION
Inputs Still Required for a Similar Quote
The photograph cannot define cabinet depth, bracket structure or service access; these inputs must come from the buyer, local engineer or installer.
TECHNICAL REVIEW PATH
How a Comparable Blade Cabinet Quote Is Defined
These are quotation and coordination checkpoints, not claims about the photographed cabinet’s original production history.
Cabinet Layout
Confirm dimensions, viewing faces, graphic area, depth and intended service opening.
Bracket Interface
Define the bracket geometry, wall connection, local structural scope and lifting or access limits.
Face & Illumination
Define face construction, LED arrangement, voltage and the required functional review when included in the order.
Packing & Handling
Define whether the cabinet ships assembled or sectioned, plus face protection, hardware labels and unloading limits.
START YOUR PROJECT
Prepare a Quote for a Similar Blade Cabinet
Send artwork, target dimensions, storefront and wall photos, bracket information, voltage, service-access needs, quantity and destination. Use the linked power guide and Export Packaging Checklist to organize the project inputs.