INSTALLATION REFERENCE · BLADE CABINET

Double-Sided Illuminated Blade Cabinet Installation Reference

The current photograph shows a compact double-sided illuminated blade cabinet mounted perpendicular to a storefront. It does not verify original cabinet fabrication, testing, packing or installation scope.

  • Visible double-sided projecting format
  • Wall bracket and installed position visible
  • Comparable quotes require bracket, access and exposure inputs
Illuminated double-sided blade sign cabinet installed on a commercial storefront

RELATED REVIEW PATH

Review the Product, Building Interface and Packing Controls for This Reference

Use these pages to compare the visible blade-cabinet format with the wall, bracket, electrical and shipment inputs required for a comparable quotation.

01

LED Light Box System

Review viewing direction, face construction, graphic changes and service access.

Review product details →

02

Commercial Buildings

Check façade, structure, site access and local engineering coordination.

Review application needs →

03

Packaging & Logistics

See how protection and installer-oriented packing are planned, and use the LED Sign Voltage & Power Planning Guide to define the electrical interface.

Review packing controls →

INSTALLATION REFERENCE

What This Reference Can Verify

Only observable features and clearly stated evidence limits are included below.

Reference TypeInstalled double-sided blade cabinet
Public IdentifiersClient and location not publicly disclosed
Evidence ShownDouble-sided illuminated cabinet installed on a storefront façade
Visible DetailsProjecting orientation, relative proportions, wall bracket and illuminated faces
Not VerifiedMaterials, cabinet depth, LED layout, face access, testing, packing or installation result
Similar Quote NeedsArtwork, dimensions, face and cabinet construction, bracket and wall interface, service access, voltage, exposure, quantity and destination

QUOTE PREPARATION

Inputs Still Required for a Similar Quote

The photograph cannot define cabinet depth, bracket structure or service access; these inputs must come from the buyer, local engineer or installer.

01

Cabinet & Face Dimensions

Provide overall width, height and depth targets, face type, graphic method and viewing directions.

02

Bracket & Wall Interface

Identify wall construction, support points, bracket responsibility, permitted penetrations and wind or structural requirements.

03

Electrical & Service Access

Confirm destination voltage, cable entry, driver location, face or panel removal and maintenance access.

TECHNICAL REVIEW PATH

How a Comparable Blade Cabinet Quote Is Defined

These are quotation and coordination checkpoints, not claims about the photographed cabinet’s original production history.

Cabinet Layout

Confirm dimensions, viewing faces, graphic area, depth and intended service opening.

Bracket Interface

Define the bracket geometry, wall connection, local structural scope and lifting or access limits.

Face & Illumination

Define face construction, LED arrangement, voltage and the required functional review when included in the order.

Packing & Handling

Define whether the cabinet ships assembled or sectioned, plus face protection, hardware labels and unloading limits.

START YOUR PROJECT

Prepare a Quote for a Similar Blade Cabinet

Send artwork, target dimensions, storefront and wall photos, bracket information, voltage, service-access needs, quantity and destination. Use the linked power guide and Export Packaging Checklist to organize the project inputs.