QUALITY INSPECTION

Inspection Records Tied to the Approved Sign Drawing

Inspection follows the approved production reference so dimensions, finish, mounting details, illumination and project-specific components can be checked before release.

  • Drawing-based inspection criteria
  • Visual, dimensional and functional checks
  • Recorded release reference before packing
Illuminated channel letters suspended on a workshop frame with wiring and power supplies visible
Worker arranging LED modules and wiring on shaped sign panels

INSPECTION BASIS

Inspection Must Follow the Approved Project Reference

Custom signs differ in construction and installation requirements. The inspection baseline is the approved drawing or production reference, together with the checks agreed for that project.

Inspection criteria come from that reference; the defined checks and release result are recorded before packing.

INSPECTION CRITERIA

What We Check Before Release

The relevant checks are defined by the sign construction and agreed project requirements.

01

Dimensions

Check key sign dimensions against the approved production reference.

02

Finish

Review visible surfaces, color and finish references against the agreed project requirements.

03

Mounting Details

Confirm supplied studs, rails, backing, holes or other agreed mounting references where applicable.

04

Illumination & Electrical Function

Check illumination, LED operation, wiring and relevant electrical components for illuminated signs where applicable.

05

Components & Hardware

Verify the agreed sign components, hardware and supplied accessories before release.

06

Packing Release

Confirm the inspected sign and related components are ready for the agreed packing stage.

INSPECTION EVIDENCE

Inspection Evidence From Assembly & Illumination Checks

These views show wiring details and powered samples used to review assembly and illumination. Order-specific inspection points and records are agreed separately.

RELEASE PROCESS

From Drawing Check to Release Record

Complete the agreed checks and record the release result before the product enters packing.

Drawing / Reference Check

Confirm the finished sign against the approved project reference and defined inspection points.

Visual & Dimensional Check

Review important dimensions, visible finish and project-specific physical details.

Functional Check

For illuminated products, check lighting and relevant electrical function where applicable.

Release Record

Record the defined inspection result before the approved sign moves to packing or handover.

BUYER EVIDENCE

Inspection Records Available for Project Review

Relevant records may be provided according to the project scope and agreed buyer requirements.

  • Approved drawing or production reference
  • Dimension and mounting-point inspection photos, where agreed
  • Relevant finished-face and edge photos
  • Illumination or functional check references, where applicable
  • Packing or release references, where agreed

CAPABILITY FAQ

Questions About Quality Inspection

Project-specific checks, inspection photos and release decisions.

Can I request specific inspection points for my project?

Yes. Identify the details that matter to your project and agree the inspection points and required records before production or inspection.

Are dimensions checked against the approved drawing?

Key dimensions are reviewed against the approved drawing or production reference. Identify any critical fit or mounting dimensions when defining the inspection scope.

Can illumination and electrical function be checked before packing?

Illuminated products can be powered for the agreed lighting and relevant electrical checks. Confirm the required scope, duration and records for your project.

Can inspection photos be provided?

Relevant dimension, finish, illumination and release photos may be provided where agreed. Specify the required views and records before inspection.

What happens if an item does not match the approved reference?

The item is reviewed against the approved reference and corrected or reported before packing release. Any changed requirement needs to be agreed before release.