ABOUT PRIDLED · CUSTOM SIGN MANUFACTURING

Custom Signs, Made for Your Ideas

PridLED creates custom signs for businesses and individuals. Whether you need one sign for your space or signs for a larger project, tell us what you want to create.

For businesses, individuals and professional partners. Orders from 1 piece.

Technicians assembling white channel letters along a PridLED workshop production line
PridLED workshop · channel-letter assembly

Built for Custom Sign Projects

We make illuminated and non-illuminated signs around your text, logo or design. Choose a suitable sign for a shop, office or personal space, or discuss a larger order. Before production, the agreed design brings together materials, construction and the details needed to make your sign.

20+

Years in sign manufacturing

500+

Custom sign projects

30+

Countries supplied

2,000 m²

Manufacturing facility

FACTORY ENVIRONMENT

Step Inside the Factory

Workshop overview · Play the 1 min 15 sec factory tour (office and production areas).

A working environment, from parts to packed signs.

See the people, worktables and production areas behind custom sign orders. The tour includes office and workshop views.

WHAT TO LOOK FOR

Sign components in progress. Assembly workstations. Finished signs prepared for packing.

FABRICATION & ASSEMBLY

Real Work, Visible in the Details

From cut parts to assembled letters, these workshop images show what each production stage involves.

Laser cutting a letter shape from sheet metal

01 / LASER CUTTING

Sheet-metal components

Letter shapes cut from sheet material.

Technician welding a metal channel-letter return

02 / METAL FABRICATION

Letter bodies and returns

Metal returns joined into the sign body.

CNC router cutting sign components from a sheet

03 / CNC ROUTING

Panels and sign components

Sheet components processed on the CNC worktable.

Technician positioning LED modules and wiring inside a channel letter

04 / LED ASSEMBLY

Modules and wiring

LED layout and cable routes assembled inside the letter.

MANUFACTURING PROCESS

What Happens After Drawing Approval

The approved drawing connects four production stages. Detailed methods depend on the sign construction and project requirements.

01

Process the materials

Cut, route and form metal or acrylic components to the approved drawing.

02

Fabricate & finish

Weld, grind and finish the sign body; review edges, surfaces and structural assembly.

03

Assemble the lighting

Fit LED modules, wiring and drivers around the agreed voltage, cable exits and access.

04

Inspect & pack

Review dimensions, finish, lighting and hardware before preparing the agreed packing scope.

BUYER REVIEW

What Buyers Can Verify Before Shipment

Agree the review points for your project: dimensions, finish, illumination, supplied hardware and packing.

White illuminated channel letters connected for a power-on lighting check
Power-on lighting check · illuminated letter faces

Lighting & finished-sign review

Review electrical function, illumination consistency and visible finish. Confirm any project-specific test or aging requirements before production.

Factory workers preparing cardboard cartons along the sign packing line
Factory packing area · carton preparation

Packing & project handover

Confirm sign components, mounting hardware, labels and protective packing against the agreed shipment scope.

FACTORY PROOF

Six Points to Review With Our Team

01

Drawing review

Construction, dimensions and installation inputs.

02

Fabrication

Sign bodies, components and surface finish.

03

LED assembly

Module layout, wiring and cable exits.

04

Inspection

Visible finish and agreed functional checks.

05

Packing

Protection, hardware and shipment scope.

06

Documentation

Applicable records and project information.

COMPLIANCE & DOCUMENTATION

Selected Supplier & Component Records

Named supplier and component records. Confirm the holder, scope and project applicability; these records do not certify PridLED or every finished sign.

Supplier ISO 9001 certificate preview, expired 27 August 2026

Blueview · Expired supplier record

ISO 9001:2015

Expired 27 Aug 2026.

Supplier ISO 14001 certificate preview, valid through 12 March 2027

Blueview · Supplier record

ISO 14001:2015

Valid through 12 Mar 2027.

SGS fixed luminaire verification preview, applicability requires revalidation

Blueview · Applicability to revalidate

SGS fixed luminaire

Check scope for the proposed component.

Historical Rightleds RoHS certificate scan from 2007

Rightleds · Historical supplier record

RoHS record · 2007

Historical reference; low-resolution scan.

Historical Rightleds CE certificate scan from 2007

Rightleds · Historical supplier record

CE record · 2007

Historical reference; verify current scope.

Historical Rightleds CE declaration scan from 2013

Rightleds · Historical supplier record

CE declaration · 2013

Historical reference; verify current scope.

START WITH YOUR PROJECT

Send Your Sign Project for Engineering Review

Share your idea, preferred size and quantity, if known. A logo, sketch, reference image or description is enough to start the conversation.