BULB-LIT LETTERS
Custom Marquee Letters
Create a statement with bulb-lit letters, symbols or a complete word. Explore options for events, venues and suitable display spaces, starting from 1 letter or 1 complete set. Your quote will list the included letters or parts and the agreed support and power components.

PRODUCT EXAMPLES
Explore Marquee Letter Builds
Compare lettering, scale, bulb patterns and installation appearances. Select an image for a closer look.








COMPARE THE OPTIONS
Choose the Marquee Format
Start with how the letters will be placed and grouped. Material and finish are reviewed separately.

Freestanding Marquee Letters
Individual letter bodies or sets for floor placement and display.
Confirm overall size, base or support, handling and power arrangement.

Mounted Marquee Letters
Letters fixed to a wall or supporting structure.
Confirm the supporting surface, fixing positions, cable route and service access.

Individual Letters & Symbols
Single characters, numbers or graphic shapes.
Confirm the outline, body construction, bulb layout and placement.

Multi-Letter Sets
Coordinated words or groups of letter bodies.
Confirm alignment, spacing, handling and the supplied scope.
PRODUCT CONSTRUCTION
The Details Behind the Marquee Build
Review the letter body, bulb layout and illuminated appearance together.

Letter Body & Return
The unlit letters show their body edges, returns and face layout. Shape and depth are reviewed around the artwork, scale and selected build.

Bulb Layout & Face
Visible bulbs follow the letter strokes. Bulb positions, spacing and access to the selected sockets are reviewed with the outline.

Letter Placement & Lighting Effect
Illuminated letter bodies show the bulb pattern and the depth of the dark returns. Letter spacing and placement are reviewed with the display layout.
WHAT YOU CAN DEFINE
Customize the Letter & Bulb Layout
Bring an artwork file or a visual reference. These choices are developed together around the intended placement.
Letter Shape & Size
Letter shape, proportions and overall size are reviewed from the artwork, viewing distance and available space.
Letter Body / Material
Share a preferred material or construction reference. Body material, return depth and the visible face are confirmed for the selected build.
Bulb Layout & Spacing
Bulb count and spacing are developed around the letter shape, scale and required visual density.
Bulb Style / Light Color
Share the bulb appearance and light color you want. The available bulb and socket combination is confirmed for the build.
Finish & Color
The letter body finish and color are confirmed against the approved project reference.
Set Configuration
Define a single character, number, symbol, complete word or coordinated set. Repeat orders refer back to the approved design.
PLAN THE INSTALLATION
Mounting, Handling & Bulb Access
The way a letter is moved, supported and serviced matters as much as its appearance.
Mounting & Support
Freestanding bases, wall fixings or project-specific supports are reviewed around the letter build and supporting surface.
Handling & Transport
Share doorway, lift, transport and storage limits, plus how often the letters will move. Large or repeatedly handled sets need these details reviewed early.
Bulb / Socket Access
Confirm how bulbs and sockets will be reached. The selected build determines whether access is from the face, rear or another agreed location.
Cable & Power
Review the cable route and connection location with the installation. The product circuit and the site mains supply are separate parts of the power arrangement.
Indoor / Outdoor Environment
Describe the intended location and actual exposure. Body, bulbs, connections and support are reviewed for the proposed conditions.
Stability & Placement
For floor-standing letters, review size, base, placement and support against the real environment and the responsible installer’s requirements.
MANUFACTURING REFERENCES
From Letter Body to Lighting Test
The agreed outline, bulb arrangement and installation conditions guide each stage.
01
Letter Body Fabrication

Body components and returns are prepared around the agreed outline, depth and finish.
02
Bulb & Socket Fit

Bulb positions and the selected socket arrangement follow the agreed face layout. Replacement access is reviewed before assembly.
03
Lighting Check

The assembled letters are powered on for a visual lighting check. The final wiring and connection arrangement follows the agreed build.
04
Packing Preparation

Packing, component grouping and handover information are agreed around the set, handling plan and destination.
START YOUR REVIEW
What We Need to Confirm
Start with what you already have. We will identify the remaining details during review.
| Project item | What to share |
|---|---|
| Artwork / Lettering | Logo files, lettering style or a usable visual reference. |
| Overall Size | Approximate letter dimensions or the available display space. |
| Letter / Set Configuration | Single characters, symbols, words and the intended arrangement. |
| Letter Body / Finish | Preferred construction, visible finish and color reference, if known. |
| Bulb Style / Light Color | Bulb appearance, light color and a reference for the desired visual density. |
| Mounting / Support | Floor placement, wall or structure details, proposed support and handling needs. |
| Cable / Power | Cable route, connection location, known site supply and access requirements. |
| Indoor / Outdoor Environment | Intended location, actual exposure and any repeated moves or reuse. |
| Quantity | Number of letters or sets, plus any planned repeat orders. |
| Project Location | Installation city / country and relevant site or venue conditions. |
| Delivery | Destination, transport or access limits and the expected supplied scope. |
BUYER QUESTIONS
Questions About Marquee Letters
Can you build marquee letters from my artwork or lettering style?
Send the lettering or logo file, an approximate size and a reference for the bulb appearance. We review the outline, body and bulb layout before agreeing the build.
Can marquee letters be freestanding or wall-mounted?
Both placement approaches can be reviewed. Share the floor or wall details, letter dimensions, proposed location and power route so the support and fixing arrangement can be confirmed.
How are bulb spacing and letter depth confirmed?
The artwork, stroke width, scale and desired bulb density are considered together. The selected bulbs, socket arrangement and body depth are confirmed for the project.
Can bulbs or sockets be accessed for replacement?
Access depends on the selected bulb, socket and body construction. Confirm the required maintenance access before the design is finalized; do not assume every build uses the same replacement method.
What information is needed for large freestanding letters?
Send the overall dimensions, floor and placement details, venue access, transport limits and expected handling frequency. Base, support, stability and any proposed split sections are reviewed for those conditions.
Can approved letter sets be repeated for future orders?
Share the approved artwork or drawing reference, required quantity and any changed installation conditions. We confirm the applicable body, bulbs, finish and supplied scope for the repeat order.
SELECTED TECHNICAL GUIDES
Plan the Next Detail
START YOUR MARQUEE PROJECT
Tell Us Your Marquee Letter Idea
Tell us the letter, word or shape you have in mind and where it will be displayed. One letter or set is welcome. Share a reference image or description; size, support, handling and power details can be confirmed as the design develops.