DOCUMENT CONTROL

Compliance Documentation by Holder, Scope and Status

Review available records without treating a supplier certificate or component document as certification of PridLED or of every finished sign.

  • Legal holder and issuer shown for each readable record
  • Validity and revalidation status stated
  • Final applicability confirmed against the selected project components
Illustrative engineering review of project documentation and manufactured sign components

HOW TO READ THESE RECORDS

A Certificate Is Not a Universal Finished-Sign Claim

The classification below separates supplier management-system records from product or component evidence. None of the displayed files is presented as a PridLED company certificate.

01 · HOLDER

Identify the Legal Holder

The company named on a record determines whose management system, product or component is covered.

02 · SCOPE

Read the Stated Scope

A management-system certificate, luminaire verification or material record covers only the scope written on that document.

03 · STATUS

Check Dates and Revalidation

Expired and undated legacy records remain historical references until a current source document is verified.

04 · PROJECT FIT

Confirm the Selected Parts

Documentation is matched to the actual LEDs, drivers, materials and destination requirements before order release.

READABLE SOURCE RECORDS

Current, Expired and Revalidation Status Are Kept Separate

Use these files as document-control references. Request the project document package before relying on any record for approvals, permits or procurement requirements.

CURRENT SUPPLIER RECORD

ISO 14001:2015 Environmental Management System

This record belongs to the named LED light-source supplier. It does not certify PridLED or a completed custom sign.

ClassificationSupplier record
HolderSichuan Blueview Elec-optic Tech Co., Ltd.
IssuerTÜV Rheinland Cert GmbH
Certificate01 104 1833552
ScopeDesign and manufacture of LED light sources
Issue date2024-02-19 (shown on document)
Valid from2024-03-13
Expiry date2027-03-12

EXPIRED · HISTORICAL

ISO 9001:2015 Quality Management System

The document expired on 27 August 2026. It is retained only as supplier history and must not be represented as current.

ClassificationSupplier record
HolderSichuan Blueview Elec-optic Tech Co., Ltd.
IssuerTÜV Rheinland Cert GmbH
Certificate01 100 2332618
ScopeDesign and manufacture of LED light sources
Issue date2023-08-28
Valid from2023-08-28
Expiry date2026-08-27

REVALIDATION REQUIRED

SGS Verification of Compliance — Fixed Luminaire

This verification names a supplier product category and test standards. No expiry date is visible on the supplied page, so current status must be confirmed for the exact selected item.

ClassificationSupplier product / component record
ApplicantBlueview Ec-optic Tech Co., Ltd.
ManufacturerSame as applicant
IssuerSGS-CSTC Standards Technical Services Co., Ltd.
Record numberGZES2207014319LM
ProductLED border tubing and contour lighting; fixed luminaire
StandardsEN IEC 60598-2-1:2021; EN IEC 60598-1:2021 + A11:2022
Issue date2022-08-18
Expiry dateNot shown on supplied page

PROJECT DOCUMENT REQUEST

Confirm Applicability Before Quotation

Compliance needs differ by destination, installation, selected components and the buyer’s own approval process.

  • State the required standard or restricted-substance requirement
  • Identify any mandated component brand or model
  • Confirm whether the document supports procurement, permit review or installer handover
  • Request current holder, issuer, scope and validity information

DOCUMENT PREVIEWS

ISO 14001 certificate preview for Sichuan Blueview Elec-optic Tech Co., Ltd., valid through March 2027

ISO 14001 · Current supplier record

Expired ISO 9001 certificate preview for Sichuan Blueview Elec-optic Tech Co., Ltd.

ISO 9001 · Expired supplier record

SGS verification of compliance preview for Blueview LED border tubing and contour lighting

SGS fixed luminaire · Revalidation required

Low-resolution historical RightLEDs RoHS certificate preview dated 2007

RoHS 2007 · Historical archive

Low-resolution historical RightLEDs CE certificate preview dated 2007

CE 2007 · Historical archive

Low-resolution historical EC Declaration of Conformity preview dated 2013

EC declaration 2013 · Historical archive

LEGACY ARCHIVE

Low-Resolution Records Are Not Presented as Current Evidence

These images are shown transparently as historical source material. Higher-resolution originals and current replacements are required before external reliance.

HISTORICAL · REVALIDATION REQUIRED

Legacy RightLEDs RoHS Record

The available image is a low-resolution 2007 archive. Full-resolution holder, issuer and scope verification is required before external reliance.

Classification: Supplier / component archive
Visible date: 2007
Current status: Not verified

HISTORICAL · REVALIDATION REQUIRED

Legacy RightLEDs CE Record

The available image is a low-resolution 2007 archive. It is not evidence of current conformity for a selected component or finished sign.

Classification: Supplier / component archive
Visible date: 2007
Current status: Not verified

HISTORICAL · REVALIDATION REQUIRED

Legacy EC Declaration of Conformity

The available declaration is dated 2013. Exact product identity and current applicability must be checked against a current signed source file.

Classification: Supplier / component archive
Visible date: 2013
Current status: Not verified

WHAT TO STATE IN THE RFQ

Request Documentation for the Actual Project Configuration

State the exact requirement so the applicable record can be checked before quotation.

  • Destination country or region and project location
  • Required standard, listing or restricted-substance requirement
  • Component brands or models mandated by the buyer
  • Required document holder, issue date and validity
  • Whether the document is needed for procurement, permit review or installer handover

START YOUR PROJECT

Request Documentation for a Specific Project

Tell us the product you are considering, the destination and any documentation requirements you know. You may ask before drawings are complete. Available records will be checked against the actual proposed product and components.