CUSTOM LIGHT BOXES

Custom LED Light Box Signs

Display your logo, artwork or message on an illuminated face. Choose a light box for a storefront, wall or display area, starting from 1 light box. Share your image or idea, then explore the size, shape, face material and mounting options.

  • Fabric, acrylic and metal cabinet formats
  • Single-sided, double-sided and projecting options
  • Graphics access and maintenance planned before fabrication
Illuminated projecting light box sign installed on a commercial storefront

COMPARE THE FORMATS

Choose the Light Box Format

Start with the graphic and viewing arrangement, then review the face system and cabinet build. A similar appearance can use different internal construction.

Three illuminated portrait poster displays mounted on an interior wall.
Graphic display referenceThis photograph shows the display appearance; the face attachment is not visible.

Fabric / SEG Light Box

A replaceable fabric graphic creates a broad illuminated display area.

Confirm frame size, graphic access and the installation conditions.

Round and rectangular projecting sign samples with plain white faces and visible wall brackets.
Rigid-face cabinet referencesRound and rectangular projecting samples.

Acrylic / Rigid Face Cabinet

A rigid illuminated face carries lettering, logos or graphics.

Confirm cabinet depth, face construction and service access.

Illuminated projecting light box sign installed on a commercial storefront.
Projecting cabinet referenceReview both viewing faces with the proposed artwork.

Double-Sided Projecting

A cabinet extends from the wall or support for viewing from two directions.

Confirm bracket arrangement, sightlines and the cable route.

A narrow rectangular graphic display on a freestanding post beside a clothing rack.
Slim-profile display referenceThe internal lighting system is not visible in this photograph.

Slim / Edge-Lit Display

A slim display profile can suit interior graphic applications.

Confirm display size, graphic type and the proposed lighting and service method.

WHAT YOU CAN DEFINE

Customize the Cabinet & Face

Cabinet Shape & Size

Rectangular, round, oval or project-specific shapes, reviewed with the artwork and available space.

Face / Graphic Type

Rigid face, fabric graphic or another confirmed display construction. Compare flexible and rigid faces →

Single or Double Sided

Defined by where people should see the graphic and how the sign is positioned.

Cabinet Depth & Finish

Depth, visible frame and finish are reviewed with the selected cabinet build.

Lighting

LED layout and illumination are reviewed around cabinet depth, face and the desired effect. Review illumination planning →

Mounting

Wall-mounted, projecting, suspended or another confirmed arrangement, coordinated with the site.

PLAN THE SITE INTERFACE

Installation, Graphic Change & Service Access

Installation is only one part of the review. Plan how the graphic, lighting and power components can be reached after the sign is in place.

Viewing Direction

Mark the directions from which people should see the graphic. This helps define the number of faces and their orientation.

Mounting & Structure

Share the wall, bracket or suspension location and the supporting structure. Fixing positions and the supplied mounting scope are reviewed together.

Graphic Replacement

Tell us whether the graphic will remain fixed or change. The cabinet design determines how the face or graphic is reached and removed. Plan graphic replacement →

LED / Driver Access

Agree where lighting components can be reached before fabrication, including access clearance and removable parts.

Cable & Power Entry

Coordinate the cable route, power entry and driver location with the installation site. Review power planning →

Indoor / Outdoor Exposure

Identify the actual environment. Cabinet construction, sealing and access details are reviewed for that location.

Rear of an oval black sign cabinet showing three attached mounting fittings.
Oval Cabinet RearVisible rear fittings; the fixing specification is project-specific.
Rear of a rectangular hanging sign with two suspension points and an inset hardware detail.
Hanging Sign RearSuspension points and rear panel reference.

MANUFACTURING REFERENCES

From Cabinet Fabrication to Lighting Test

The approved cabinet, face, lighting and access details guide fabrication and assembly.

01

Cabinet Fabrication

Fiber laser cutting shaped parts from sheet metal.
Sheet component cutting.

Cut and form components for the agreed cabinet construction.

02

Component Preparation

Repeated curved sign cabinet components arranged in rows on a workshop floor.
Grouped cabinet components.

Prepare and group cabinet components for assembly.

03

Finished Illumination Check

An illuminated shaped sign sample on a workshop surface, with light around its edges and visible red and black wires.
Illuminated sample with visible power leads.

Review the visible lighting effect with the face in place before packing.

04

Packing & Handover

Long taped cartons arranged inside an open wooden crate with dividers.
Cartons grouped inside an open crate.

Packing and supplied items are prepared around the agreed project scope and destination.

Packing references, component labels and installation information are agreed with the supplied scope. Read the manufacturing guide →

START YOUR REVIEW

What We Need to Confirm

Start with what you already have. We will identify the remaining project details during review.

Project itemWhat to share
Artwork / GraphicArtwork file or a usable reference for the message, logo or display graphic.
Overall SizeApproximate dimensions or the available installation space.
Light Box TypePreferred format or a product example you like, if known.
Single / Double SidedViewing directions and the number of visible faces.
Face / Graphic TypePreferred face material and whether graphics need to change.
Cabinet / FinishCabinet shape, visible depth or finish references, where available.
MountingSite photograph, wall or support details and the proposed mounting position.
Power / Service AccessKnown power location, cable route and space for future access.
QuantityRequired quantity and any planned repeat orders.
Project LocationInstallation location and indoor or outdoor conditions.
DeliveryDestination and the items or documentation expected within the supply scope.

BUYER QUESTIONS

Questions About LED Light Box Signs

Can I start without final cabinet dimensions?

Yes. Share an approximate size, the available space or a site photograph. We can begin the review with that information and identify the dimensions that need to be agreed before production.

Can the graphic or face be replaced later?

That depends on the selected face and cabinet construction. Tell us about expected graphic changes early so the opening method, face retention and access clearance can be reviewed.

Can you build single-sided and double-sided light boxes?

Both formats are part of the product range. The viewing directions, mounting position and artwork help determine which arrangement suits your project.

What information is needed for a projecting light box?

Send the artwork, approximate cabinet size, viewing directions and a photograph or drawing of the mounting location. Include known wall or support details, available projection and cable route.

How is service access reviewed before production?

We review how the face, LEDs and driver can be reached in the proposed installation. Access direction, removable parts, clearance and cable routing need to be agreed with the cabinet construction.

What should I send for a quotation?

Start with artwork or a reference, approximate size, quantity and destination. Add the preferred light box format, viewing direction and installation context if available. We will identify the remaining details during review.

START YOUR LIGHT BOX PROJECT

Create a Light Box for Your Message

Start with the graphic, logo or message you want to display, even if the artwork is not finished. Tell us where the light box will be used and any size preference. Orders start from 1 light box.