PridLED - Custom LED Sign Manufacturer
Cabinet Signs / Light Box Signs - custom LED signs manufacturer

Cabinet Signs / Light Box Signs

Cabinet signs (also called light boxes) are durable, weatherproof sign enclosures with illuminated faces for storefronts and shopping malls.

Gallery

Cabinet Signs / Light Box Signs - Gallery

Rectangular LED light box sign for bar storefrontDouble sided hanging LED light box for bubble tea shopCustom bird shaped projecting LED light box signWarm orange backlit LED light box for bar interior wallRound LED light box sign for tropical tea shopAngled double sided light box for coffee shop and bistroLarge rectangular LED cabinet light box for retail storeSlim wall mounted LED light box for restaurant menuSquare LED light box sign for beauty salon storefrontBacklit LED cabinet sign for gym and fitness centerCustom shaped LED light box for bakery and dessert shopOutdoor waterproof LED light box for hotel entranceIlluminated LED cabinet sign for shopping mall kiosk

What Are Cabinet Signs / Light Boxes?

Cabinet signs (also called light boxes or box signs) are rectangular or custom-shaped illuminated enclosures with an acrylic face. They are widely used for retail storefronts, indoor directories, menu boards and wayfinding signage — large format and very bright.

LED cabinet light box sign example

Manufacturing Process

Built In-House, Tested Before Shipping

Step 01 - Artwork Review
01

Artwork Review

We review your artwork, dimensions and mounting requirements, then produce a detailed drawing for your approval.

Step 02 - Precision Fabrication
02

Precision Fabrication

All parts are cut, formed and welded in our own factory - no outsourcing, full quality control at every step.

Step 03 - LED Assembly & Wiring
03

LED Assembly & Wiring

High-quality LED modules are installed, wired and configured to your brightness and color requirements.

Step 04 - QC Test & Packing
04

QC Test & Packing

Every sign undergoes 24-hour illumination testing, then is carefully packed in custom export cartons.

Applications

Common Use Cases

LED cabinet sign for bar and pub storefront

Bars & Pubs

Bar, pub and beer garden storefront light box signage.

LED cabinet sign for bubble tea and beverage shop

Bubble Tea Shops

Bubble tea, juice bar and specialty beverage store light boxes.

LED cabinet sign custom shape animal design

Custom Shape Signs

Animal shapes, logos and custom shaped projecting light box signage.

LED cabinet sign for bar and lounge interior

Bar & Lounge Interiors

Bar, lounge and club interior illuminated feature wall light boxes.

LED cabinet sign for food and beverage retail

Food & Beverage Retail

Restaurant, tea shop and food retail round and custom light box signs.

LED cabinet sign for coffee shop and bistro

Coffee Shops & Bistros

Coffee shop, bistro and cafe double-sided projecting light box signs.

Specifications

Standard Specs

Frame Material
Aluminum extrusion, rust-proof
Face Material
Acrylic panel, fabric, or polycarbonate
Light Source
LED strips, even illumination
Shape Options
Rectangle, square, circle, oval, custom shape
Double Sided
Available for projecting signs
Waterproof
IP65 rated for outdoor use
Lifespan
50,000+ hours, 2-year warranty
MOQ
1 piece / 1 set

Why Choose Us

Key Features

Bright, even illumination across entire face
Weatherproof, built for outdoor durability
Snap-open frame for easy graphic changes
Double-sided projecting signs available
Low maintenance, energy efficient LED

Not sure which type?

Which Sign Type Is Right For You?

You need slim poster display frame
You need dimensional illuminated letters
You need neon-style graphic signs
You need non-illuminated metal letters

Frequently Asked Questions

Get a Custom Quote

Send us your artwork and dimensions. We'll reply within 24 hours with pricing and lead time.