In a restaurant or hotel, a sign with a visible cable is a failed sign. Concealed wiring is not a single product decision; it is a sequence that has to be agreed by the interior contractor, the services engineer, the sign fabricator and the electrician before the wall closes. Once the drywall is up and painted, the options shrink to a surface raceway or a patch and repaint.

What “concealed” actually means
Three things disappear in a properly concealed installation: the cable, the driver and the connection point. Each has a different owner and a different failure mode. The cable needs a route; the driver needs a location that is reachable and cool; the connection needs a point that an electrician can isolate.
There are only three routes in a finished interior: a wall cavity, a ceiling void, or a dedicated chase built for the purpose. If none of the three exists at the design stage, the installation will end up with a raceway — and a raceway is a legitimate solution, but it should be a decision, not a surprise on installation day.
Who owns which decision
The failure pattern is always the same: the sign is designed after the finishes are specified, and the wiring is solved by whoever arrives last. Assigning the decisions early prevents it:
- Interior contractor — cavity depth, backing, the position of any access panel, and the repair of the finished surface.
- Services engineer — the supply circuit, the isolator position, and whether the sign load can share a circuit.
- Sign fabricator — the cable exit point on each letter, the branch arrangement, the driver specification, and the low-voltage side of the connection.
- Electrician on site — the final connection, commissioning and the test record.
The sign shop drawing should be issued before the wall is closed. That single sequencing rule prevents most concealed-wiring problems, because a cavity that is 40 mm too shallow is easy to fix before drywall and expensive afterwards.
Route the conduit before the wall closes
A drywall partition over studs typically gives 70–90 mm of cavity, which is enough for a 20–25 mm conduit plus a low-voltage cable, but not enough for a conduit and a driver. The route should be drawn, not improvised:
- Keep the run as short and straight as the plan allows, with pull points at accessible positions rather than inside a sealed pocket.
- Avoid sharp bends; a swept bend is free at first fix and saves the pull later.
- Leave slack at the sign end — 200–300 mm — so the letter can be positioned and adjusted without tension on the gland.
- Confirm the exit point against the letter drawing, not against the wall centreline. A 30 mm offset is visible once the letter is mounted.
Where the ceiling is the route, the same rules apply with one addition: the ceiling void is usually shared with ductwork, sprinkler pipe and lighting track. Coordinate the run before the ceiling grid is set, or the cable will end up crossing a luminaire.
Driver location, heat and access
The driver is the component that fails first, so its location is a maintenance decision. It belongs in a ceiling void, a plant room or a service cupboard with an accessible panel — never inside a sealed wall cavity and never packed against insulation.
Three practical requirements: at least 300 mm of free air around the driver, an ambient temperature that stays within its rating (ceiling voids above kitchens run hot), and a labelled circuit so the next person can isolate the right one. An access panel of roughly 300 × 300 mm at the driver position turns a service call into ten minutes.
12 V or 24 V, and why run length matters
Both voltages are common for sign modules, and the difference shows up over distance. A 12 V run loses brightness along its length sooner than a 24 V run; as a working guide, keep a 12 V branch to roughly 5 m and a 24 V branch to roughly 10 m before the far end dims visibly. Longer façades are split into branches rather than run as one circuit.
Voltage drop is the number behind that rule: keep it within about 5 % at the last module. In a restaurant with a long banquette wall, that usually means two or three drivers rather than one large unit, which is also better for redundancy — a single driver failure takes out one section instead of the whole sign.
Driver loading stays at or below about 80 % of rating. A driver run at its limit in a hot ceiling void is the most predictable failure in the whole installation.
If the sign is going to be dimmed at night, the dimming interface belongs in the same decision. A constant-voltage driver dimmed by a wall dimmer can flicker at low output, and a camera picks up flicker the eye ignores. Specify a dimmer matched to the driver and test the sign at about 10 % output before handover, not only at full brightness.
Commission the run by measurement rather than by look: voltage at the last module of each branch, and a light reading at the first and the last letter. If the two readings differ by more than about 10 %, the branch needs splitting or the voltage raised.
Terminations and sealing
Every connection that is not inside the driver enclosure should be made with a proper gland, a strain relief and a sealed joint. Twisted-and-taped joints fail in humid kitchens and are not acceptable in a commercial installation.
Keep low-voltage and mains wiring physically separate, label each branch at both ends, and use a colour or numbering scheme that matches the drawing. In a multi-letter sign, the label on the letter and the label on the branch are the only things standing between a service technician and a guess.
Restaurant and hospitality constraints
Hospitality interiors add three conditions that a plain office fit-out does not have. Grease and steam from a kitchen attack seals and cable jackets; condensate from ceiling services drips into voids; and cleaning chemicals reach surfaces that were never designed to be cleaned. The practical answers are IP-rated glands, a driver located outside the grease plume, and a cable route that does not pass under a condensate line.
Health inspections also look at cable routing in food areas. A cable that can be reached by a cleaning cloth is a cable that will be damaged; a cable in a sealed conduit is not an issue. Choose the sealed route early, when it is still a drawing change rather than a retrofit.
Low-voltage cable and after-hours servicing
The low-voltage side is usually a two-core or multi-core cable sized for the branch current, run inside the conduit with a small spare capacity. Two details are worth writing down: the cable should be rated for the ambient temperature of the void, and it should be identifiable at both ends without tracing it by hand.
Service access matters more in hospitality than in an office, because the building is busy when the sign is dark. A driver behind a ceiling panel above a dining table cannot be reached during service; a driver in a plant room can be swapped before opening. Where access is genuinely constrained, split the load across two drivers in different accessible positions rather than concentrating everything in one unreachable place.
When concealed is not possible
Not every interior allows a concealed route, and pretending otherwise wastes a week of drawings. A solid masonry wall, a listed façade, or a tenancy where the finishes are already complete will usually end in a surface raceway. That is not a failure; it is a different design.
The raceway should be part of the composition: routed along a reveal, a ceiling line or the top of a joinery unit, finished in the wall colour, and sized to take the cable without pinching. A raceway installed down the middle of a tiled wall reads as an afterthought; the same raceway in a shadow line disappears.
Agree the raceway footprint with the landlord or the interior designer at drawing stage, because a surface element that was agreed is a detail, while one that appears on installation day is a defect.
Commissioning and handover
Before the interior contractor closes the last panel, the sign should be energised and checked: every branch lit, no flicker, dimming smooth through its range, and no warm spot at a driver. Photograph the lit result and the driver position, and write the circuit reference on the handover sheet.
A concealed installation without a photograph of where the driver sits is a future service visit with a hole saw.
Route options against conditions
| Condition on site | Practical route | What to confirm first |
|---|---|---|
| Drywall over studs, 70–90 mm cavity | Conduit in the cavity to a ceiling void | Stud positions and the letter cable exit |
| Solid wall, no cavity | Surface raceway, colour matched | Landlord approval for the raceway footprint |
| Ceiling void shared with services | Conduit through the void to a service cupboard | Clash check with ducts and lighting |
| Heritage or finished feature wall | Chase with a designed access panel | Who repairs the finish, and to what standard |
Frequently asked questions
Can the driver go inside the wall?
Only behind an accessible panel. A sealed driver is a guaranteed future demolition, and the driver is the part most likely to need replacement.
Does 24 V always beat 12 V?
For long runs, yes, because the drop is lower for the same cable. For short interior signs the difference is negligible, and the driver availability may decide it.
Who connects the sign to the building supply?
A qualified local electrician, working from the branch schedule and the driver list. The factory supplies the low-voltage side and the documentation; it should not be asked to certify a building circuit.
What if the wall is already closed?
A surface raceway or a designed access panel are the two honest options. Cutting into a finished wall without a repair plan trades a wiring problem for a finishes problem.
Send the wall section, the ceiling photographs and the letter layout, and the wiring route can be drawn before the first fix. The restaurant channel letter notes cover grease and steam conditions, and the restaurant neon notes cover low-voltage runs for interior lines.


