
Dimensional Non-Illuminated Letters
Dimensional metal and acrylic letters for building identification, reception walls and feature walls. Clean, architectural, built to last.

Gallery
Non-Illuminated Letters in Detail






What Are Non-Illuminated Letters?
Non-illuminated dimensional letters are three-dimensional signs without internal lighting. They are typically made from stainless steel, aluminum, acrylic or brass and mounted on building facades, reception walls, lobbies and feature walls.
Common Materials
Stainless steel: Brushed or mirror finish. Durable outdoors, premium appearance. Gold or black titanium PVD options available.
Aluminum: Lightweight, painted to any PMS color. Cost-effective for interior and exterior use.
Acrylic: Solid color or clear edge-lit options. Budget-friendly for reception walls and interior branding.
Material & Mounting
Choose Your Build

Standoff Letters
Mounted off the wall with standoff posts. Clean architectural look.

Flush-Mounted Letters
Installed flat against the wall. Minimal modern reception signage.

Brushed Metal
Stainless steel, aluminum or brass. Premium corporate look.

Acrylic & PVC
Color-matched acrylic or PVC. Budget-friendly for interiors.
Start Your Project
What We Need to Quote
Send your logo or typography. We'll recommend materials and mounting for your wall.
Send Your Details- Artwork: logo, text or typography reference
- Approximate height per letter or total width
- Material preference: metal, acrylic, or PVC
- Finish: brushed, matte, painted color, or chrome
- Mounting: standoff posts or flush-mounted
- Wall material: drywall, concrete, glass, wood, or tile
In Our Factory
How Dimensional Letters Are Made

TIG welding stainless steel seams

Brushed finish on stainless steel
Specifications
Standard Specs
| Material | Stainless steel (304/316) / Aluminum / Acrylic / Brass |
| Thickness | 3mm / 5mm / 8mm (custom up to 15mm) |
| Finish | Brushed / Mirror / Powder-coated / PVD gold / Black |
| Size Range | From 5cm individual letters up to 3m+ logos |
| Mounting | Standoff spacers (10–20mm) / Flush mounted / Adhesive |
| Use | Indoor reception / Building facade / Monument signs |
| Warranty | 5 years (stainless steel / aluminum) |
| Lead Time | 5–10 working days |
| Shipping | Sea freight / Air freight / Express (DHL, FedEx) |
| Packing | Foam + export carton (lightweight, low shipping cost) |
FAQ
Non-Illuminated Questions
Need a Reception Wall or Building ID?
Send your logo and a photo of the wall. We'll recommend the best material and mounting.


