PridLED
→All Products

Custom LED Light Box Signs

Fabric, acrylic and projecting light boxes with uniform LED illumination. For retail, hospitality, exhibition and commercial display.

Oval projecting light box storefront sign

Gallery

Light Boxes in Detail

Pizza shop projecting light boxCoffee shop light box signCustom LED light box signs for interior displayProjecting light box sign for bakery storefrontLight box with raised letter faceRound suspended hanging light box

What Are LED Light Box Signs?

Light box signs are illuminated enclosures with a printed face that glows evenly from internal LED panels. They are widely used for storefronts, shopping malls, exhibitions, restaurants and directional signage because they deliver large-format, uniform illumination at a lower cost than channel letters.

Common Light Box Types

Fabric light boxes (tension fabric): Stretch fabric graphic prints over an aluminum frame. Lightweight, easy to change graphics, popular for malls and exhibitions.

Acrylic light boxes: Rigid acrylic face with aluminum or steel housing. Durable for outdoor use, available in rectangle, oval, circle or custom shapes.

Projecting (double-sided) light boxes: Mount perpendicular to the building wall, visible from two directions. Ideal for narrow storefronts and pedestrian streets.

Edge-lit light boxes: LEDs on the edge of an acrylic panel. Ultra-thin profile for premium interior displays.

Light Box Types

Choose Your Format

Fabric Light Boxes

Fabric Light Boxes

Tension fabric prints with aluminum frame and LED edge lighting.

Acrylic Light Boxes

Acrylic Light Boxes

Frosted acrylic face with backlit LED for even glow.

Projecting Light Boxes

Projecting Light Boxes

Wall-mounted projecting signs visible from both directions.

Large Format Displays

Large Format Displays

Oversized light boxes for building facades and malls.

Start Your Project

What We Need to Quote

Send your graphic design or reference photo. We'll confirm construction and materials.

Send Your Details
  • Artwork or design file for the face print
  • Dimensions: width, height, and depth
  • Single-sided or double-sided
  • Indoor or outdoor rating needed
  • Mounting method: wall-hung, projecting, or freestanding
  • Quantity and destination country

In Our Factory

How Light Boxes Are Built

Spray painting light box frame

Powder-coating aluminum frame

Spray painting finish

Color matching to PMS references

Specifications

Standard Specs

TypeFabric light box / Acrylic light box / Projecting light box
Size Range30cm × 30cm up to 3m × 2m (single panel)
FrameAluminum profile, powder-coated any color
Light SourceEdge-lit LED strips / Back-lit LED panels, 50,000+ hours
PrintingUV-printed fabric / Acrylic face to PMS colors
Voltage110–120V / 220–240V (per destination)
Warranty2 years
ComponentsCE / RoHS / UL approved LED strips and drivers
Lead Time7–12 working days
ShippingSea freight / Air freight / Express (DHL, FedEx)
PackingFoam + export wooden crate

FAQ

Light Box Questions

Need a Light Box for Your Space?

Send dimensions and artwork. We'll quote fabrication and shipping.