PridLED
→All Products

LED Channel Letters

Make your name or logo stand out with dimensional illuminated letters. Choose front-lit, halo-lit or combined lighting for a storefront, office or feature wall. Order from 1 complete sign or letter set.

Custom LED channel letters installed at night - front lit storefront signs

Gallery

Channel Letters in Detail

Front lit channel letters for restaurant storefrontWholesale LED channel letters for retail storefrontHalo lit reverse channel letters on dark facadeIlluminated logo channel letters for retail brandLED channel letter sign for education center at nightCustom channel letters by day - storefront identification

Lighting Options

Four Lighting Styles

Choose the appearance first. We can review the build once you share your artwork and installation context.

Front-Lit

Front-Lit

Bright illuminated face. Best for storefronts and maximum night visibility.

Halo-Lit

Halo-Lit

Light glows on the wall behind. Premium look for offices and hotels.

Dual-Lit

Dual-Lit

Front + halo combined. Maximum impact for corner buildings and premium brands.

Dot Matrix

Dot Matrix

Exposed LED dots visible. Industrial look for casinos and entertainment.

Gallery

Recent Channel Letter Projects

Retail storefront channel lettersRestaurant channel letter signCommercial building letter signStorefront dimensional letteringCommercial building brand signBakery storefront signWella halo-lit channel lettersASICS illuminated channel letter logoChannel letter colored face detailEducation center channel letters daytimeEducation center channel letters night glowWarm white channel letter lighting close-up

What Are Channel Letters?

LED channel letters are three-dimensional illuminated signs built from individual letters or logos. Each letter has a metal housing (the "can"), an acrylic face or return, and internal LED modules. They are the most common storefront sign type for retail chains, restaurants, banks and office buildings because they offer excellent night visibility, long service life and a professional appearance.

As a wholesale channel letters manufacturer in China, PridLED fabricates custom channel letters from aluminum and stainless steel using computerized CNC cutting and TIG welding. Every letter is assembled, wired and tested before packing. LED modules and power supplies are CE and RoHS approved. We supply sign companies, contractors and brands in 30+ countries.

Common Types of Channel Letters

Front-lit (full-face) channel letters: The most popular style. Light shines through the acrylic face, making the letter itself bright. Best for maximum night visibility and bold branding.

Halo-lit (reverse) channel letters: Light shines from the back of the letter onto the wall, creating a glowing halo effect. Premium look for office buildings, hotels and upscale retail.

Dual-lit (front + back) channel letters: Combines both front and halo lighting for maximum impact. Often used for corner buildings and premium brand locations.

Open-face (stock) channel letters: No acrylic cover — exposed LED modules visible. Industrial or vintage aesthetic, less common for retail.

Resin letters: Smooth epoxy resin face with even, glow-free illumination. Popular in shopping malls and luxury retail for its seamless finish.

Mini acrylic letters: Small, thin and lightweight (24mm depth). Designed for indoor reception walls and chain-store interiors.

Trimless letters: No metal trim cap around the acrylic face — a clean, edge-to-edge modern look.

RGB / chameleon letters: Color-changing LED with remote control. Dynamic gradient and chase effects for entertainment venues and events.

Materials and Construction

Standard channel letters use aluminum returns (sides) with 3M or Lucid acrylic faces. Stainless steel is available for coastal or high-corrosion environments. Letter depths typically range from 3 inches (76 mm) to 8 inches (200 mm), depending on viewing distance and required brightness.

How to Order Wholesale Channel Letters

Send us your artwork (AI, EPS, SVG or PDF), the target letter height, number of letters, mounting surface type, and destination voltage. We will prepare shop drawings for your approval before production starts. Order minimum is 1 complete sign or letter set — no MOQ for prototypes.

Project Planning

What You Define & What We Confirm

You don't need every answer to start. Share the known site conditions; we will identify what still needs confirming.

What You Can Define

  • Letterform & Size: shape and proportions developed from your artwork
  • Face & Return: face construction, return depth and edge treatment
  • Color & Finish: color references and surface finishes confirmed before production
  • Lighting Effect: front-lit, halo-lit, dual-lit or other confirmed configurations
  • Mounting Approach: direct studs, raceway, backer panels, rails or stand-offs

What We Need to Confirm

  • Artwork & Dimensions: logo/lettering files, approximate dimensions and quantity
  • Surface & Mounting: installation surface, available fixing area, site photos
  • Cable Route & Power: cable path, site supply, driver location, maintenance access
  • Environment: indoor or outdoor use, exposure and installation location
  • Delivery Requirements: destination, shipment grouping, handover support

Production

From Drawing to Delivery

01

Fabrication

Letter shapes cut, formed, welded and finished to approved dimensions.

02

LED Assembly

LED modules, wiring and drivers fitted around agreed voltage and cable exits.

03

Testing

Power-on lighting check, dimension verification and visible finish review.

04

Pack & Ship

Protective packing, hardware labeling and grouping for international delivery.

In Our Factory

How Channel Letters Are Made

Spot welding channel letter returns

Spot welding letter returns to acrylic face

TIG welding metal channel letter

TIG welding stainless steel letter seams

Specifications

Standard Specs

Letter Height15cm – 200cm (custom above 200cm)
Return Depth5cm, 8cm, 10cm (custom depths available)
Face MaterialAcrylic (UV-printed to PMS) / Polycarbonate
Return MaterialPowder-coated aluminum / Brushed stainless steel
LED Lifespan50,000+ hours (name-brand modules, IP65)
Voltage110–120V / 220–240V (per destination)
MountingRaceway / Standoff / Backer panel / Direct studs
Warranty3 years (LED modules and drivers)
ComponentsCE / RoHS / UL approved LED modules and drivers
Lead Time7–15 working days (depends on quantity)
ShippingSea freight / Air freight / Express (DHL, FedEx)
PackingCustom foam + export wooden crate

FAQ

Common Questions

Ready to Start Your Channel Letter Project?

Send your artwork, dimensions and site details. We'll reply within 24 hours.